• A66 – Salzbachtal bridge

    A66 – Salzbachtal bridge Client Autobahn GmbH of the Federal Republic of Germany Branch West AS Darmstadt Construction time 06.12.2021 - 14.12.2021 Pavement renewal B263 as part of the replacement construction of the A66 Salzbachtal bridge Main works Basic renewal of the roadways and the bicycle path including kerbstones Overview 800 tons of asphalt base [...] Continue Reading
  • Frankfurt – ONE

    Frankfurt - ONE Client CA Immo Deutschland GmbH Construction time October 2021 - July 2022 ONE office and hotel tower incl. multi-storey car park - outdoor facilities Main works Construction of the outdoor facilities: Demolition work Construction of substructure Paving work Drainage Overview 4.000 m² demolition 4.000 m² paving Special features Construction in the urban [...] Continue Reading
  • Offenbach – Schumannstraße

    Offenbach – Schumannstraße Client ESO Dienstleistungsgesellschaft mbH Construction time 2020 - 2021 Pavement renewal Schumannstraße, Offenbach Overview approx. 800m² surface course Special features Inner-city construction site Continue Reading
  • Wiesbaden – Kaiser Friedrich Ring

    Wiesbaden – Kaiser Friedrich Ring Client City of Wiesbaden Construction time August 2021 - October 2021 Reconstruction of accident blackspot Kaiser-Friedrich-Ring, Wiesbaden Main works Construction of traffic islands with lowered crossing kerbs Overview Paving work 200 m² Asphalt work 350m³ Construction of foundations for new LSA system (5 pieces) Laying of empty pipes for power supply [...] Continue Reading
  • B43 – OD Rüsselsheim

    B43 – OD Rüsselsheim Client HM Heppenheim Construction time 30.07.2021 - 18.12.2021 B43 – OD Rüsselsheim Main works Asphalt surface course renewal Overview 42.000 m² binder and surface course Special features Inner-city construction measure with full closure 15 construction phases, 4 of them on weekends Continue Reading
  • Ramp Program 2021

    Ramp Program 2021 Client Die Autobahn GmbH des Bundes / NL West, Außenstelle Darmstadt Construction time 18.06.2021 - 22.10.2021 Ramp Program 2021 Main works Pavement renewal of asphalt and mastic asphalt Concrete demolition Bankett works Dismantling/installation of protective equipment Overview approx. 26.000 m² asphalt milling approx. 32.000 m² consolidation work approx. 30.000 m² asphalt paving [...] Continue Reading
  • Karben – Petterweil

    Karben - Petterweil Client City of Karben, Stadtwerke Karben, HM and OVAG Construction time March 2021 to estimated March 2022 L3352 OD Petterweil Main works Water pipe Sewer Renew supply lines Road construction Asphalt work Expansion of barrier-free bus stops and crossing points Overview 4.500 m² asphalt 3.000 m³ excavated earth 1.300 m curbs 1.100 [...] Continue Reading
  • Bad Vilbel – Wiesengasse

    Bad Vilbel - Wiesengasse Client City of Bad Vilbel / Public utility Bad Vilbel Construction time 12.04.2021 to 04.06.2022 Renovation of the Frankfurter Straße BA 2 Main works Water pipeline construction Gas pipeline construction Power line construction Road construction Paving work Overview 3.000 to frost protection layer 0/45 4.000 to ballast base 0/45 1.000 to [...] Continue Reading
  • B 38 – Georgenhausen

    B 38 - Georgenhausen Client Hessen Mobil Heppenheim Construction time 19.03.2021 to 23.05.2021 (weekends only) B 38 Georgenhausen - L 3115, resurfacing of the road surface Main works Asphalt work roadbed construction Overview 9 construction sections over 7 weekends 32.000 m² asphalt binder and asphalt surface course 12.200 to of milled material 3.100 to asphalt [...] Continue Reading
  • Offenbach – Ludwigstraße

    Offenbach - Ludwigstraße Client ESO Stadtservice GmbH - Offenbach Construction time 26.02.2020 to 31.12.2021 Offenbach - Asphalt pavement renewal Main works Asphalt pavement renewal (milling of the old asphalt pavement and new construction of the asphalt surface). Overview approx. 2.150 m² asphalt paving approx. 525 m mastic asphalt gutter Continue Reading