• Diez – ALDI

    Diez - ALDI Client ALDI - GmbH & Co. KG Montabaur Construction time 15.10.2020 to 15.03.2021 ALDI - Neubau, Diez Main works Sewer and road construction Paving work with outdoor facilities Overview 2.500 m² asphalt (base course, bonding and cover layer) 2.000 m² paving 1.500 rm sewer and cable ducts Special features Keeping to the [...] Continue Reading
  • Hanau – Orangery

    Hanau - Orangery Client Hanau Immobilien- und Baumanagement (Owner-operated company of the city of Hanau) Construction time December 2020 to February 2021 with scheduled work breaks Hanau Schloss Philippsruhe - Change of use of the Orangery Main works Grading of the existing surface Asphalt paving, base and surface course (both by means of 2D control) [...] Continue Reading
  • Wiesbaden – Mainzerstraße

    Wiesbaden - Mainzerstraße Client City of Wiesbaden Volume 100.000 Euro Construction time 15.01.2021 to 28.02.2021 Traffic island Mainzerstraße State capital Wiesbaden Main works Asphalt work Curbstone work Overview 250 m high curbstone approx. 130 to. asphalt work Special features Execution of the main works under partial traffic closure and alternating traffic safety in the direction [...] Continue Reading
  • Frankfurt – Dunantring

    Frankfurt - KVP Dunantring Client Magistrate of the City of Frankfurt am Main Office for road construction and development Construction time March 2020 to April 2022 Redesign of the junction Kurmainzer Str. / Dunantring / Sossenheimer Weg into a roundabout square Main works Road construction Road drainage, sewer construction Renewal of gas and water pipes [...] Continue Reading
  • Langen – Prinzessin-Margaret-Allee

    Langen - Prinzessin-Margaret-Allee Client Hessen Mobil Darmstadt Construction time 20th July - 12th August 2020 K168 surfacing renewal Langen - Egelsbach Main works Surfacing renewal Installation of a crossing aid for bicycle traffic Overview 4 construction phases 18.000 m² surfacing renewal ca. 3.200 m banquet renewal Continue Reading
  • Frankfurt – Stresemannallee

    Frankfurt - Stresemannallee Client City Stadt Frankfurt Office for Road Construction and Development Construction time March 2020 to July 2020 Frankfurt, Complete renewal of Stresemannallee between Bodenbacher Weg and Karlsbader Straße Main works Basic construction with soil replacement, laying of a sink box collector pipe and connection to the city canal using a bricked shaft. [...] Continue Reading
  • A66 – Eschborn

    A66 - Eschborn Client HessenMobil Darmstadt Construction time May 2020 to November 2020 A66 Basic renewal between exit F-Höchst and exit Eschborn in both directions Main works Basic renewal of the individual layers of the roadway Overview approx. 30.000 m² Hydraulically bound base courses and Full extension in asphalt construction Special features 5 preparation phases [...] Continue Reading
  • Kronberg – Westerbachstraße

    Kronberg - Westerbachstraße Client City administration Kronberg im Taunus Volume 1.300.000 Euro Construction time January 2020 to October 2020 Kronberg, Fundamental renewal of Westerbachstraße Main works Earthworks Sewerage Water supply Road construction Overview Length of the construction project: 560 m 330 m PP pipes DN 300 laid 3 shafts, 24 gullies 380 m drinking water [...] Continue Reading
  • Offenbach – Berliner Straße

    Offenbach - Berliner Straße Client ESO Dienstleistungsgesellschaft mbH Construction time 14th April - 20th April 2020 Offenbach - Berliner Straße Main works Milling Production of asphalt binder course/ covering layer Production of mastic asphalt gutter Overview Approx. 3.500 m² (approx. 1.000 tons out and in again each time) 840 m mastic asphalt gutter Special features [...] Continue Reading
  • Bad Vilbel – Frankfurter Straße

    Bad Vilbel - Frankfurter Straße Client Magistrat der Stadt Bad Vilbel Construction time January 2020 to May 2020 Bad Vilbel, Attraktivierung Frankfurter Straße BA1 Main works Demolition and earthworks Edge fixings Channel Gutters Pavement Slab floorings Production of concrete base layer Special features Although a very short construction period of five months was estimated and [...] Continue Reading