Fire water cistern DGH Gaudernbach

Auftraggeber

Client

City of Weilburg

Bauzeit

Construction time

23.09.2024 – 01.11.2024

Fire water cistern
DGH Gaudernbach

Main works

  • Earthworks for installation of the cistern

  • Tank installation by the city of Weilburg / Tank and container trade Hommrich (56414 Weroth)

Key data

  • Approx. 625 m³ soil excavation and disposal

  • 100 m³ extinguishing water cistern

  • Tank size: 16 m long, 3 m diameter

  • Empty weight approx. 17 tonnes

  • Was lifted into the pit with a 120 tonne crane

  • Approx. 100 tonnes of sand coating

Special features

  • For initial support of the extinguishing water supply until further supply from the local water network is established