Karben – Petterweil

Auftraggeber

Client

City of Karben, Stadtwerke Karben, HM and OVAG

Bauzeit

Construction time

March 2021 to estimated March 2022

L3352 OD Petterweil

Main works

  • Water pipe
  • Sewer
  • Renew supply lines
  • Road construction
  • Asphalt work
  • Expansion of barrier-free bus stops and crossing points

Overview

  • 4.500 m² asphalt
  • 3.000 m³ excavated earth
  • 1.300 m curbs
  • 1.100 m gutter
  • 3.000 m² pavement
  • 800 m water pipe
  • 2.500 m supply lines
  • 1.000 m empty pipe

Special features

Inner village location, residents should be granted access if possible