Karben – Petterweil
Client
City of Karben, Stadtwerke Karben, HM and OVAG
Construction time
March 2021 to estimated March 2022
L3352 OD Petterweil
Main works
- Water pipe
- Sewer
- Renew supply lines
- Road construction
- Asphalt work
- Expansion of barrier-free bus stops and crossing points
Overview
- 4.500 m² asphalt
- 3.000 m³ excavated earth
- 1.300 m curbs
- 1.100 m gutter
- 3.000 m² pavement
- 800 m water pipe
- 2.500 m supply lines
- 1.000 m empty pipe
Special features
Inner village location, residents should be granted access if possible