Karben – Petterweil

Auftraggeber

Client

Terramag GmbH

Bauzeit

Construction time

March 2023 – February 2024

Development area north of the Fuchslöcher

Main works

  • Development of a new residential area

Overview

  • 1,400 tons of AC 16 TD
  • 500 tons of AC 22 BS Pmb
  • 1,000 tons of AC 32 TS B 50/70
  • 1,600 tons disposal of construction waste Z 1.1
  • 16,000 tons disposal of soil Z 0
  • 9,000 tobs disposal of soil Z 1.1
  • 1,700 tons of adhesive C 60 C 60
  • 19,000 tons of FSS 0/32
  • 2,000 tons of FSS 0/45
  • 7,500 tons of STS 0/45
  • 27,000 tons of stone earth 0/45
  • 4,000 tons of sand
  • 2,000 m low kerbs 25/10