Ramp Program – A66 junction Erlensee

Auftraggeber

Client

Autobahn GmbH des Bundes

Bauzeit

Construction time

31.07.2023 – 29.09.2023

A66 junction Erlensee

Main works

  • Basic road renewal (Asphalt milling, Manufacturing HGT, Asphalt paving)

Overview

  • 1. BS: 15.400 m² Milling, HGT, Asphalt paving + side strip
  • 2. BS: 4.000 m² Basic road renewal (as BS 1)
  • 3.800 m² Renewal Asphalt pavement (Milling and integration of Binding layer + Cover layer)