Road maintenance depot Hadamar
Client
Landesbetrieb Bau und Immobilien Hessen (LBIH)
Construction time
June 2019 to November 2019
New construction of the road maintenance depot Hadamar-Oberweyer
Main works
- Laying of supply and disposal lines
- Pavement & civil engineering works
- Manufacture of special shafts
Overview
- approx. 600 m³ earthworks
- approx. 110 m cable protection pipes
- approx. 50 m connection line for road drainage
- 4 cable shafts
- approx. 300 m Edge trim
- approx. 4.500 m² paving work
- approx. 350 m ACO channel DN 400
- 1 pc. Coalescence separator
- 1 pc. Prefilter Shaft
- 1 pc. Emergency container/average tank
- approx. 550 m² mastic asphalt in salt hall/WHG area
Special features
In the street „Auf dem Sechsmorgen“ mastic asphalt was laid and at the same time the WHG surface was constructed in the area of the salt hall. The paving work was carried out in 3 construction phases.