Karben – Renewal of through road

Auftraggeber

Client

City of Karben and the state of Hessen –
represented by Hessen Mobil

Bauzeit

Construction time

June 2018 to August 2019

Renewal of the Karben through road

Main works

Renewal of the Karben – Klein Karben through road and the state road 3205 including the associated works:

  • Gullies
  • Street drains
  • Public transport stops
  • Barrier-free crossings and walkways

Special features

Due to the extraordinarily short construction time it was necessary to use several columns in parallel.
Despite the high outside temperatures in summer, the planned construction time of 5 calendar weeks was not reached.