Harbour quarter – south construction site
Client
Company Thomas Schleser
Construction time
24.09.2024 – 10.10.2024
Harbour quarter –
south construction site
Main work
-
Asphalt work
Key data
-
Asphalt base course AC 22 TS 50/70, 7 cm thick
-
Colour mastic asphalt Colour 0/8 – grey, 3.5 cm thick – area approx. 120 m²
-
Asphalt grinding with planetary grinder by Bitu-Print
Special features
-
Cramped conditions (entrance area of a tower block)
-
Material transport and execution of the work by hand