Fire water cistern DGH Gaudernbach
Client
City of Weilburg
Construction time
23.09.2024 – 01.11.2024
Fire water cistern
DGH Gaudernbach
Main works
-
Earthworks for installation of the cistern
-
Tank installation by the city of Weilburg / Tank and container trade Hommrich (56414 Weroth)
Key data
-
Approx. 625 m³ soil excavation and disposal
-
100 m³ extinguishing water cistern
-
Tank size: 16 m long, 3 m diameter
-
Empty weight approx. 17 tonnes
-
Was lifted into the pit with a 120 tonne crane
-
Approx. 100 tonnes of sand coating
Special features
-
For initial support of the extinguishing water supply until further supply from the local water network is established