Deponiepark Brandholz – Neu‑Anspach

Client
RMD Rhein-Main Deponie GmbH
Construction period
24.02.2026 – 13.03.2026
Refurbishment of the warehouse for the delivery of organic waste
Main works
-
Milling, loading and disposing of old asphalt surfacing
-
Shot-blast the concrete surface, then primed and sealed it with PMMA resin
-
Installation of the waterproofing consisting of a bituminous membrane with a raised reinforcing layer
-
Laying the wearing course of mastic asphalt
Key data
-
265 m² of refurbished space

















