Deponiepark Brandholz – Neu‑Anspach

Auftraggeber

Client

RMD Rhein-Main Deponie GmbH

Bauzeit

Construction period

24.02.2026 – 13.03.2026

Refurbishment of the warehouse for the delivery of organic waste

Main works

  • Milling, loading and disposing of old asphalt surfacing

  • Shot-blast the concrete surface, then primed and sealed it with PMMA resin

  • Installation of the waterproofing consisting of a bituminous membrane with a raised reinforcing layer

  • Laying the wearing course of mastic asphalt

Key data

  • 265 m² of refurbished space