A66 – Eschborn

Auftraggeber

Client

HessenMobil Darmstadt

Bauzeit

Construction time

May 2020 to November 2020

A66 Basic renewal between exit F-Höchst and exit Eschborn in both directions

Main works

  • Basic renewal of the individual layers of the roadway

Overview

  • approx. 30.000 m² Hydraulically bound base courses and Full extension in asphalt construction

Special features

  • 5 preparation phases (4 x during the night, 1x during the day)
  • 4 main construction phases and 2 secondary construction phases for the main work
  • Short time slots and tight space conditions due to the particularly heavy traffic load and local conditions