Bad Vilbel – Wiesengasse
Client
City of Bad Vilbel / Public utility Bad Vilbel
Construction time
12.04.2021 to 04.06.2022
Renovation of the Frankfurter Straße BA 2
Main works
- Water pipeline construction
- Gas pipeline construction
- Power line construction
- Road construction
- Paving work
Overview
- 3.000 to frost protection layer 0/45
- 4.000 to ballast base 0/45
- 1.000 to coarse gravel
- 8.500 to soil disposal (Z0 – DK II)
- 5.500 m² paving by RINN
- 1.000 m curbstones
Special features
- Major project with 8 construction sections