Bad Vilbel – Wiesengasse

Auftraggeber

Client

City of Bad Vilbel / Public utility Bad Vilbel

Bauzeit

Construction time

12.04.2021 to 04.06.2022

Renovation of the Frankfurter Straße BA 2

Main works

  • Water pipeline construction
  • Gas pipeline construction
  • Power line construction
  • Road construction
  • Paving work

Overview

  • 3.000 to frost protection layer 0/45
  • 4.000 to ballast base 0/45
  • 1.000 to coarse gravel
  • 8.500 to soil disposal (Z0 – DK II)
  • 5.500 m² paving by RINN
  • 1.000 m curbstones

Special features

  • Major project with 8 construction sections