Diez – ALDI
Client
ALDI – GmbH & Co. KG Montabaur
Construction time
15.10.2020 to 15.03.2021
ALDI – Neubau, Diez
Main works
- Sewer and road construction
- Paving work with outdoor facilities
Overview
- 2.500 m² asphalt (base course, bonding and cover layer)
- 2.000 m² paving
- 1.500 rm sewer and cable ducts
Special features
Keeping to the opening date despite bad weather with frost and snowfall.