Diez – ALDI

Auftraggeber

Client

ALDI – GmbH & Co. KG Montabaur

Bauzeit

Construction time

15.10.2020 to 15.03.2021

ALDI – Neubau, Diez

Main works

  • Sewer and road construction
  • Paving work with outdoor facilities

Overview

  • 2.500 m² asphalt (base course, bonding and cover layer)
  • 2.000 m² paving
  • 1.500 rm sewer and cable ducts

Special features

Keeping to the opening date despite bad weather with frost and snowfall.