Hanau – Wallonian-Dutch Church
Client
Stadt Hanau Infrastruktur Service
Hanau Netz GmbH
Stadtwerke Hanau GmbH
Telecom Deutschland GmbH
Construction time
March 2019 to Oktober 2020
Hanau – Redesign of the square & streets around the Walloon-Dutch Church
Overview
- Total area 17.050 m² (divided into:)
- 4.950 m² natural stone paving basalt and dolomite d = 14 cm on drain asphalt
- 6.200 m² coloured asphalt beige around the WNK
- 3.800 m² of lawn areas with 80 pop-up sprinklers
- 1.400 m² concrete block paving
- 700 m² asphalt surface in side streets
Main works
- 6,700 m³ excavated earth for surface paving
- 9,800 tonnes of ballast base layer
- 47 Preparing and planting tree locations
- 2,450 m irrigation lines, 40 tree irrigations
- 500 m³ excavation for 600 m gas and water pipe
- 500 m³ excavation for 6,700 m cable protection pipes, 62 lighting poles
- 120 m³ excavation for 250 m district heating pipes
Special features
Building in inner city location – close coordination with the traffic authorities due to many neighbouring building sites & nearby heritage-protected partial ruins in exposed location on the building site.