Henninger Turm – Frankfurt a. M.
Client
CONCEPTAPLAN Baubetreuungs- und Vertriebsgesellschaft für Haus- und Grundbesitz mbH
Construction time
March 2015 to July 2019
Development work on the former Henninger Bräu site
Main works
- Terrain profiling, laying of supply and disposal lines
- Road works
- Reconditioning, sieving and breaking of RC material.
Key data
- approx. 18,000 m³ earthworks
- approx. 3,200 m cable conduits
- approx. 540 m drainage pipe diameter, diameter 300-600 mm
- approx. 300 m road drainage connection pipe
- approx. 32 road inlets
- approx. 3,700 m² asphalt work
- approx. 3,500 m edging
- approx. 3,400 m² paving work
- 42 lighting poles with approx. 700 m cable trench