Industrial hall in Meudt

Auftraggeber

Client

Orben Wasseraufbereitung GmbH & Co. HG

Bauzeit

Construction time

05. – 08. November 2019

Industrial hall in Meudt

Main works

  • Mastic asphalt screed on a separating layer

Overview

  • approx. 1.300 m² mastic asphalt installation
  • approx. 260 m² edge storage with Titacord
  • approx. 1.300 m² mastic asphalt surface blasted with quartz sand

Special features

  • The hall at Industriestr. 6 was built with one layer of mastic asphalt (3.5cm thick) on a separating layer by hand. Approx. 40 tons of mastic asphalt were laid daily.