Kronberg – Westerbachstraße

Auftraggeber

Client

City administration Kronberg im Taunus

Auftragsvolumen

Volume

1.300.000 Euro

Bauzeit

Construction time

January 2020 to October 2020

Kronberg, Fundamental renewal of Westerbachstraße

Main works

  • Earthworks
  • Sewerage
  • Water supply
  • Road construction

Overview

  • Length of the construction project: 560 m
  • 330 m PP pipes DN 300 laid
  • 3 shafts, 24 gullies
  • 380 m drinking water pipeline
  • 1200 m street lamp cable with 12 lamp foundations
  • 3700 m² AC 32 TN, 10 cm and AC 8 DN 4 cm
  • 1100 m² multi-size plaster 10 cm platinum medium
  • 1260 m paved channel
  • approx. 1500 m different curbs

Special features

Implementation of 5 construction phases