Offenbach – Berliner Straße
![](https://wilhelm-schuetz.com/wp-content/uploads/2020/05/Wilhelm-Schütz-Offenbach-F2-scaled.jpg)
Client
ESO Dienstleistungsgesellschaft mbH
Construction time
14th April – 20th April 2020
Offenbach – Berliner Straße
Main works
- Milling
- Production of asphalt binder course/ covering layer
- Production of mastic asphalt gutter
Overview
- Approx. 3.500 m² (approx. 1.000 tons out and in again each time)
- 840 m mastic asphalt gutter
Special features
Complete closure due to reduced traffic volume as a result of the COVID-19 outbreak.