Offenbach – Ludwigstraße
Client
ESO Stadtservice GmbH – Offenbach
Construction time
26.02.2020 to 31.12.2021
Offenbach – Asphalt pavement renewal
Main works
- Asphalt pavement renewal (milling of the old asphalt pavement and new construction of the asphalt surface).
Overview
- approx. 2.150 m² asphalt paving
- approx. 525 m mastic asphalt gutter