Redesign of Gaudernbach cemetery

Auftraggeber

Client

City of Weilburg

Bauzeit

Construction time

29.07.2024 – 09.08.2024

Trainee project
Gaudernbach cemetery

Main works

  • Earthworks, paving and kerbstones

Key data

  • 120 m deep kerbstones, 50 m deep kerbstones adjusted to height

  • 250 m² paving, 30 m² existing paving levelled to height

Special features

  • The construction site was carried out by the trainees themselves, with the help and site management of the site manager Jörg Schwarz

  • They were able to gain experience in work preparation, operate excavators and wheel loaders, independently specify heights, set kerbs in concrete, lay paving, adjust the height of existing paving and kerbs