Frankfurt – Hanauer Landstraße 211

Auftraggeber

Client

Company Thomas Schleser

Bauzeit

Construction time

14.06.2024 – 03.07.2024

Frankfurt
Hanauer Landstraße 211

Main works

  • Laying of asphalt base course and coloured mastic asphalt surface course

Key data

  • Asphalt base course AC 22 TS – 12 cm thick

  • BAM COLOUR mastic asphalt MA 5 in green – 3.5 cm thick: approx. 125.00 m²

Special features

  • The asphalt base course and the colour mastic asphalt were laid by hand

  • The green mastic asphalt was ground down by Bituprint after paving