Redesign of Gaudernbach cemetery
Client
City of Weilburg
Construction time
29.07.2024 – 09.08.2024
Trainee project
Gaudernbach cemetery
Main works
-
Earthworks, paving and kerbstones
Key data
-
120 m deep kerbstones, 50 m deep kerbstones adjusted to height
-
250 m² paving, 30 m² existing paving levelled to height
Special features
-
The construction site was carried out by the trainees themselves, with the help and site management of the site manager Jörg Schwarz
-
They were able to gain experience in work preparation, operate excavators and wheel loaders, independently specify heights, set kerbs in concrete, lay paving, adjust the height of existing paving and kerbs