Königstein – Falkenstein
Client
J. & W. Ferschke GmbH
Construction time
17.05.2024 – 19.06.2024
Asphalt work
Königstein – Falkenstein
Main work
-
Asphalt work
Key data
-
Asphalt base course AC 32 TS 10 cm thick, approx. 230 m²
-
BAM COLOUR SMA 8 special mix in beige 4 cm thick, approx. 230 m²
-
Installation with paver and by hand
Special features
-
The paving area is an access road with a gradient of up to 19 %, which makes paving and compaction considerably more difficult