Königstein – Falkenstein

Auftraggeber

Client

J. & W. Ferschke GmbH

Bauzeit

Construction time

17.05.2024 – 19.06.2024

Asphalt work
Königstein – Falkenstein

Main work

  • Asphalt work

Key data

  • Asphalt base course AC 32 TS 10 cm thick, approx. 230 m²

  • BAM COLOUR SMA 8 special mix in beige 4 cm thick, approx. 230 m²

  • Installation with paver and by hand

Special features

  • The paving area is an access road with a gradient of up to 19 %, which makes paving and compaction considerably more difficult