Hall 5 Fair – Frankfurt

Auftraggeber

Client

Messe Frankfurt Venue GmbH

Bauzeit

Construction time

March 2018 bis June 2019

Process media line reallocation and site clearance hall 5

Execution of civil engineering works for pipeline laying
New installation of cable conduit routes

Overview:

  • approx. 3,500 m³ earthworks
  • approx. 7,000 t soil disposal
  • approx. 1,600 m² re-paving
  • approx. 2,500 m² shoring work
  • approx. 2,200 linear metres of cable protection pipes DN 110 / DN 160

Special features:

  • Preliminary clearing of the construction site and partial redevelopment of Hall 5
  • Work in hall areas under height and swivel limitation
  • 2 x 23 t prefabricated shafts as connecting structures to the engineering corridor