Offenbach – Berliner Straße

Auftraggeber

Client

ESO Dienstleistungsgesellschaft mbH

Bauzeit

Construction time

14th April – 20th April 2020

Offenbach – Berliner Straße

Main works

  • Milling
  • Production of asphalt binder course/ covering layer
  • Production of mastic asphalt gutter

Overview

  • Approx. 3.500 m² (approx. 1.000 tons out and in again each time)
  • 840 m mastic asphalt gutter

Special features

Complete closure due to reduced traffic volume as a result of the COVID-19 outbreak.