Bad Vilbel – Frankfurter Straße
Client
Magistrat der Stadt Bad Vilbel
Construction time
January 2020 to May 2020
Bad Vilbel, Attraktivierung Frankfurter Straße BA1
Main works
- Demolition and earthworks
- Edge fixings
- Channel
- Gutters
- Pavement
- Slab floorings
- Production of concrete base layer
Special features
Although a very short construction period of five months was estimated and the contract was extended (road construction work in Frankfurter Strasse, channel construction work in Grüner Weg), it was possible to complete the project within the agreed time. A further challenge was, despite the tight time schedule due to the upcoming “Hessentag”, the implementation while maintaining through traffic in the very busy Frankfurt shopping street. Although the “Hessentag” was cancelled (Corona Virus) the construction time was kept to.