Bad Vilbel – Frankfurter Straße

Auftraggeber

Client

Magistrat der Stadt Bad Vilbel

Bauzeit

Construction time

January 2020 to May 2020

Bad Vilbel, Attraktivierung Frankfurter Straße BA1

Main works

  • Demolition and earthworks
  • Edge fixings
  • Channel
  • Gutters
  • Pavement
  • Slab floorings
  • Production of concrete base layer

Special features

Although a very short construction period of five months was estimated and the contract was extended (road construction work in Frankfurter Strasse, channel construction work in Grüner Weg), it was possible to complete the project within the agreed time. A further challenge was, despite the tight time schedule due to the upcoming “Hessentag”, the implementation while maintaining through traffic in the very busy Frankfurt shopping street. Although the “Hessentag” was cancelled (Corona Virus) the construction time was kept to.