Sprudelhof Bad Nauheim
![](https://wilhelm-schuetz.com/wp-content/uploads/2024/03/ws-sprudelhof-bad-nauheim-2023-fallback-IMG-web.jpg)
Client
Magistrat der Stadt Bad Nauheim
Construction time
16.11.2023 – 29.11.2023
Underground car park access ramp Sprudelhof Bad Nauheim
Main works
Waterproofing and mastic asphalt work in accordance with DIN 185332-1 and 18532-2
Overview
- 200m² ramp area
The structure consists of:
- A sealant and scratch coat of epoxy resin
- A waterproofing consisting of a bituminous membrane with a raised carrier layer and a mastic asphalt layer (second layer of the waterproofing)
- An embedding layer of mastic asphalt to protect the ramp heating
- A wear layer of mastic asphalt