Sprudelhof Bad Nauheim

Auftraggeber

Client

Magistrat der Stadt Bad Nauheim

Bauzeit

Construction time

16.11.2023 – 29.11.2023

Underground car park access ramp Sprudelhof Bad Nauheim

Main works

Waterproofing and mastic asphalt work in accordance with DIN 185332-1 and 18532-2

Overview

  • 200m² ramp area

The structure consists of:

  • A sealant and scratch coat of epoxy resin
  • A waterproofing consisting of a bituminous membrane with a raised carrier layer and a mastic asphalt layer (second layer of the waterproofing)
  • An embedding layer of mastic asphalt to protect the ramp heating
  • A wear layer of mastic asphalt

Construction site tour