Windeck – Siegbrücke

Client
Albert Weil AG
Construction period
22.08.2025 – 17.09.2025
Windeck – Siegbrücke
Main works
-
Bridge sealing
Key data
-
Two-layer sealing including expansion joint strips on prefabricated components on the railway bridge
Special features
-
Built in accordance with Deutsche Bahn guidelines