Eschborn – Crossing reconstruction

Auftraggeber

Client

Magistrate of the City of Eschborn
Department of Planning and Construction – Civil Engineering

Auftragsvolumen

Volume

2.548.950 Euro

Bauzeit

Construction time

June 2017 to September 2017

Conversion of 2 traffic-light-controlled inner-city intersections into roundabouts.

The roundabouts have a diameter of 32 and 29 metres respectively.
The conversion of 3 bus stops with bus shelters, the adaptation of the on-board facilities to the requirements for unhindered mobility, the installation of bicycle protection strips, crossing aids & the attachment of a temporary parking lot were also carried out.

Overview:

  • approx. 4,800 m³ earthworks
  • approx. 2,900 m cable conduits
  • approx. 250 m road drainage connection pipe
  • approx. 50 street inlets
  • renovation of old connection pipes
  • approx. 9,700 m² asphalt work
  • approx. 2,200 m² paving work
  • 42 lighting poles with approx. 700 m cable trench

Special features:

Work in areas that have already been rebuilt several times under traffic conditions, resulting in a large number of unknown routes.

Maintenance of adjacent traffic, consideration of the directly adjacent businesses.

Parallel work of different utilities:

  • Renewal of water and sewage pipes
  • Relocation of gas line, medium and low voltage
  • Renewal of road and roundabout lighting