• Obertiefenbach – Reconstruction bus stop

    Obertiefenbach - Reconstruction bus stop Client VLDW - Verkehrsgesellschaft Lahn-Dill-Weil mbH Construction time February 2019 to April 2020 Reconstruction of bus stop in Limburg/Weilburg district Main works Paving work Canal and drainage work Curbstone work with Kassel kerb Asphalt works Overview 6.000 m² Paving 900 m² Asphalt works 690 m³ Earthworks 4.000 m Curbside works Special [...] Continue Reading
  • Siemens – Reconstruction

    Siemens - Reconstruction Client Siemens AG Construction time August to November 2019 Siemens - Reconstruction of works road and repair work Main works approx. 6.500 m² Road surface reconstruction approx. 160 m Curbside approx. 300 m² Paving Special features Asphalt removal and installation from Friday evening to Saturday noon Continue Reading
  • Karben – Through road

    Karben - Renewal of through road Client City of Karben and the state of Hessen – represented by Hessen Mobil Construction time June 2018 to August 2019 Renewal of the Karben through road Main works Renewal of the Karben - Klein Karben through road and the state road 3205 including the associated works: Gullies Street [...] Continue Reading
  • ADAC driving safety centre – Gründau

    ADAC driving safety centre - Gründau Client ADAC Hessen- Thüringen e.V. Construction time June 2019 to August 2019 Renewal of skidding plate in ADAC driving safety centre - Gründau Main works Earthworks Channel works Reinforced concrete works Road works Continue Reading
  • Hanau – Wallonian-Dutch Church

    Hanau - Wallonian-Dutch Church Client Stadt Hanau Infrastruktur Service Hanau Netz GmbH Stadtwerke Hanau GmbH Telecom Deutschland GmbH Construction time March 2019 to Oktober 2020 Hanau - Redesign of the square & streets around the Walloon-Dutch Church Overview Total area 17.050 m² (divided into:) 4.950 m² natural stone paving basalt and dolomite d = 14 [...] Continue Reading
  • Industrial hall in Meudt

    Industrial hall in Meudt Client Orben Wasseraufbereitung GmbH & Co. HG Construction time 05. - 08. November 2019 Industrial hall in Meudt Main works Mastic asphalt screed on a separating layer Overview approx. 1.300 m² mastic asphalt installation approx. 260 m² edge storage with Titacord approx. 1.300 m² mastic asphalt surface blasted with quartz sand [...] Continue Reading
  • Road maintenance depot Hadamar

    Road maintenance depot Hadamar Client Landesbetrieb Bau und Immobilien Hessen (LBIH) Construction time June 2019 to November 2019 New construction of the road maintenance depot Hadamar-Oberweyer Main works Laying of supply and disposal lines Pavement & civil engineering works Manufacture of special shafts Overview approx. 600 m³ earthworks approx. 110 m cable protection pipes approx. [...] Continue Reading
  • B8 – Kelkheim

    B8 - Kelkheim Client Hessen Mobil, Straßen- und Verkehrsmanagement Darmstadt Construction time June 2019 to August 2019 B8 Kelkheim-Liederbach/Nieder-Hofheim, FR Süd Schütz removed and repaired approx. 16,000 m² of asphalt for this project. Overview Base course, binder course and wearing course were paved in the area of the breakdown lane and on the first lane [...] Continue Reading
  • B43 – Frankfurt Airport

    B43 - Frankfurt Airport Client Hessen Mobil, Straßen- und Verkehrsmanagement Darmstadt Construction time May 2019 to September 2019 Frankfurt, B 43 road rehabilitation in the area between interchange Ffm and Frankfurt-Süd, basic and surface renewal Schütz removed and repaired approx. 26,000 m² of asphalt for this project. Overview Hydraulically bound base course, base course, binder [...] Continue Reading
  • KVP Kelsterbach

    KVP Kelsterbach Client Municipal Volume 1.179.000 Euro Construction time May 2019 bis February 2020 KVP Kelsterbach Main works Laying of supply and disposal lines road works Overview approx. 2500 m³ earthworks approx. 800 m cable conduits approx. 160 m connecting pipe for road drainage approx. 160 m connecting pipe for road drainage approx. 3000 m² [...] Continue Reading