Ramp Program 2021
Ramp Program 2021 Client Die Autobahn GmbH des Bundes / NL West, Außenstelle Darmstadt Construction time 18.06.2021 - 22.10.2021 Ramp Program 2021 Main works Pavement renewal of asphalt and mastic asphalt Concrete demolition Bankett works Dismantling/installation of protective equipment Overview approx. 26.000 m² asphalt milling approx. 32.000 m² consolidation work approx. 30.000 m² asphalt paving [...] Continue Reading -
Karben – Petterweil
Karben - Petterweil Client City of Karben, Stadtwerke Karben, HM and OVAG Construction time March 2021 to estimated March 2022 L3352 OD Petterweil Main works Water pipe Sewer Renew supply lines Road construction Asphalt work Expansion of barrier-free bus stops and crossing points Overview 4.500 m² asphalt 3.000 m³ excavated earth 1.300 m curbs 1.100 [...] Continue Reading -
Bad Vilbel – Wiesengasse
Bad Vilbel - Wiesengasse Client City of Bad Vilbel / Public utility Bad Vilbel Construction time 12.04.2021 to 04.06.2022 Renovation of the Frankfurter Straße BA 2 Main works Water pipeline construction Gas pipeline construction Power line construction Road construction Paving work Overview 3.000 to frost protection layer 0/45 4.000 to ballast base 0/45 1.000 to [...] Continue Reading -
B 38 – Georgenhausen
B 38 - Georgenhausen Client Hessen Mobil Heppenheim Construction time 19.03.2021 to 23.05.2021 (weekends only) B 38 Georgenhausen - L 3115, resurfacing of the road surface Main works Asphalt work roadbed construction Overview 9 construction sections over 7 weekends 32.000 m² asphalt binder and asphalt surface course 12.200 to of milled material 3.100 to asphalt [...] Continue Reading -
Offenbach – Ludwigstraße
Offenbach - Ludwigstraße Client ESO Stadtservice GmbH - Offenbach Construction time 26.02.2020 to 31.12.2021 Offenbach - Asphalt pavement renewal Main works Asphalt pavement renewal (milling of the old asphalt pavement and new construction of the asphalt surface). Overview approx. 2.150 m² asphalt paving approx. 525 m mastic asphalt gutter Continue Reading -
Diez – ALDI
Diez - ALDI Client ALDI - GmbH & Co. KG Montabaur Construction time 15.10.2020 to 15.03.2021 ALDI - Neubau, Diez Main works Sewer and road construction Paving work with outdoor facilities Overview 2.500 m² asphalt (base course, bonding and cover layer) 2.000 m² paving 1.500 rm sewer and cable ducts Special features Keeping to the [...] Continue Reading -
Hanau – Orangery
Hanau - Orangery Client Hanau Immobilien- und Baumanagement (Owner-operated company of the city of Hanau) Construction time December 2020 to February 2021 with scheduled work breaks Hanau Schloss Philippsruhe - Change of use of the Orangery Main works Grading of the existing surface Asphalt paving, base and surface course (both by means of 2D control) [...] Continue Reading -
Wiesbaden – Mainzerstraße
Wiesbaden - Mainzerstraße Client City of Wiesbaden Volume 100.000 Euro Construction time 15.01.2021 to 28.02.2021 Traffic island Mainzerstraße State capital Wiesbaden Main works Asphalt work Curbstone work Overview 250 m high curbstone approx. 130 to. asphalt work Special features Execution of the main works under partial traffic closure and alternating traffic safety in the direction [...] Continue Reading -
Frankfurt – Dunantring
Frankfurt - KVP Dunantring Client Magistrate of the City of Frankfurt am Main Office for road construction and development Construction time March 2020 to April 2022 Redesign of the junction Kurmainzer Str. / Dunantring / Sossenheimer Weg into a roundabout square Main works Road construction Road drainage, sewer construction Renewal of gas and water pipes [...] Continue Reading -
Langen – Prinzessin-Margaret-Allee
Langen - Prinzessin-Margaret-Allee Client Hessen Mobil Darmstadt Construction time 20th July - 12th August 2020 K168 surfacing renewal Langen - Egelsbach Main works Surfacing renewal Installation of a crossing aid for bicycle traffic Overview 4 construction phases 18.000 m² surfacing renewal ca. 3.200 m banquet renewal Continue Reading