• KVP Kelsterbach

    KVP Kelsterbach Client Municipal Volume 1.179.000 Euro Construction time May 2019 bis February 2020 KVP Kelsterbach Main works Laying of supply and disposal lines road works Overview approx. 2500 m³ earthworks approx. 800 m cable conduits approx. 160 m connecting pipe for road drainage approx. 160 m connecting pipe for road drainage approx. 3000 m² [...] Continue Reading
  • FES Frankfurt

    FES Frankfurt Client FES Frankfurter Entsorgungs- und Service GmbH Construction time March 2019 to May 2019 Production of a base plate for a glass handling station for receiving bulk boxes. Special features No reinforcement was laid in the floor slab, steel fibre components were added to the concrete. In addition, heavy Vignol rails were laid [...] Continue Reading
  • Gießen Central

    Gießen Central Client Eurovia Beton GmbH Construction time November 2018 Pedestrian bridge from Gießen railway station to the multi-storey car park Lahnstraße Main works In three night operations, 170m² mastic asphalt protective layer and 170m² mastic asphalt covering layer were implemented in half-sided construction in order to avoid a blockage of the pedestrian bridge. Special [...] Continue Reading
  • PPR crossing

    PPR-Kreuzung Bildquelle (Hauptmotiv & Galerie 3-6): Heiko Rhode Client City of Bad Homburg & Hessen Mobil Volume 670.000 Euro Construction time July 2018 bis September 2018 PPR crossing Main works Conversion of intersection and ceiling renewal in the area towards the city centre and Dornholzhausen (city of Bad Homburg) Basic renovation B456 FR FFM, ceiling [...] Continue Reading
  • Hall 5 Fair – Frankfurt

    Hall 5 Fair - Frankfurt Client Messe Frankfurt Venue GmbH Construction time March 2018 bis June 2019 Process media line reallocation and site clearance hall 5 Execution of civil engineering works for pipeline laying New installation of cable conduit routes Overview: approx. 3,500 m³ earthworks approx. 7,000 t soil disposal approx. 1,600 m² re-paving approx. [...] Continue Reading
  • Hall 12 Fair – Frankfurt

    Hall 12 Fair - Frankfurt Client Messe Frankfurt Venue GmbH Construction time February 2018 bis August 2018 Outdoor facilities hall 12 Fair Frankfurt Execution of 21,000 m² surfaces and furnishing Overview: approx. 5,500 m³ earthworks approx. 10,000 t soil disposal approx. 10,000 m² asphalt break-up approx. 400 m road drainage connection pipe approx. 40 road [...] Continue Reading
  • Herriotstraße – Frankfurt

    Herriotstraße - Frankfurt a. M. Client Fa. Wiedemann Construction time October 2017 bis July 2018 Renovation of 4,865m² on an open-air parking deck in Herriotstraße 4 in Frankfurt The parking deck was divided into two construction phases, so that fifty percent of the space could continue to be used by the client during the construction [...] Continue Reading
  • Parking deck REWE – Essen

    Parking deck REWE - Essen Client Fa. Massenberg Construction time August 2017 bis May 2018 Renovation of a REWE parking deck in Essen Overview: Concrete surface with bitumen primer 250g/qm Parking deck with 40mm foam glas insulation S3 in hot bitumen 100/25 hot bitumen smear 1-layer geomembrane PYE-PV 200 DD laid in hot bitumen 100/25 [...] Continue Reading
  • A 61

    A 61 Client aventas.bau GmbH & Co. KG Construction time August 2017 bis October 2017 Bridge renovation - overpass over the A 61 near Dintesheim The company Schütz Gussasphalt- und Abdichtungs GmbH carried out the sealing and mastic asphalt work for the company aventas.bau GmbH & Co. The work was carried out in three construction [...] Continue Reading
  • Zollhafen – Mainz

    Zollhafen - Mainz Client August Fichter GmbH GaLaBau Straßenbau Sportstättenbau Construction time June 2017 bis December 2017 May 2019 bis June 2019 (extended section) Asphalt construction Zollhafen Mainz, lot 1 - sections FS 2, FS 3, FS 6 The urban port quarter of the future is being built in the middle of Mainz: An excellent [...] Continue Reading